Thank you, your enquiry has been received

We've received your details for your commercial battery storage installation. A named surveyor will review your enquiry and be in touch within one working day.

Your enquiry, from here

If you attached twelve months of half-hourly meter data, the surveyor can begin an indicative sizing straight away — power to the peak you need to shave, energy to its duration. If you did not, that is the first thing we will ask for, because we never size a battery from a rule of thumb.

Next comes a desk feasibility: the likely capacity, the containerised-versus-indoor decision, the fire-siting outline, and the G99 route through your local distribution network operator, which is what sets the real programme. You will have an itemised, fixed-price install proposal within seven working days, with the connection milestone marked plainly as the critical path.

One thing worth knowing before we speak: the single biggest variable in your programme is not the battery itself but your distribution network operator's connection queue. That is why we lodge the G99 application at the survey stage rather than after design sign-off, and why, on a constrained network, a G100 limitation scheme can let you connect inside your existing agreed capacity instead of waiting on a reinforcement. We will be straight with you about the likely timescale for your area.

While you wait, read how the G99 timeline works, why a constrained connection need not block you, or whether storage is worth it for your site.

Commercial Solar Across the UK

Weighing the numbers? See the business case for storage.

Check battery storage grants & funding.

Visit the UK hub for commercial solar installation.

Adding PV too? We also cover warehouse rooftop solar.

For generation on site, see solar for manufacturing plants.

Buffering chargers? Pair storage with workplace EV charging.

Get a free quote