Commercial battery size pre-check

Three sums to sense-check a proposal for commercial battery storage installation before you ask for quotes. Arithmetic only: no prices, savings or payback, and not a design.


What the sums say

Duration at full power
2 hours
Minimum energy for the peak
400 kWh
Grid route for this power
G99 Type A

Full G98 or G99 checker

What to gather before you ask for quotes

For installed-cost ranges and what is in them, read the cost guide; for grid connection, the G99 application guide.

Pre-check FAQs

What does this pre-check do?

It does three sums and nothing else: how long a battery lasts at full power (energy divided by power), the minimum energy needed to cover a peak of a given size and length (power times hours), and whether the combined power is above the 16 A per phase line that separates G98 from G99. It shows no prices, savings or payback, because those depend on your meter data and tariff.

Why does it not show savings or payback?

Because they cannot be calculated honestly without twelve months of half-hourly meter data, your actual tariff and charges, and a design. Any number produced from a postcode or a spend figure would be a guess. Give each installer your half-hourly data and ask for the savings case itemised, with its assumptions shown.

Is the answer the size of battery I need?

No. Real systems need margin for conversion losses, usable versus nameplate capacity, degradation and the control strategy. The pre-check gives the arithmetic floor so you can sense-check a proposal; the design belongs to a qualified engineer working from your data.

How do I know whether my battery is G98 or G99?

The line in the ENA guide is 16 A per phase for the combined generation and storage at the premises; above it, a Type A system is G99 and needs the network operator's agreement before installation. The G99 application guide on this site has the full checker and the stages.

Send an enquiry about your battery project

No obligation. This site is not an installer.

  • 1. Tell us about the site: what you want the battery to do, your supply, and any half-hourly data you have.
  • 2. We reply by email. This site is not an installer and takes no part in the work. There is no fixed reply time.
  • 3. Check any proposal you receive against the installer checklist before you commit to a survey.

By sending this you agree to the privacy notice, which explains that your enquiry is answered by the publisher by email and is not passed to installers or sold to anyone.

Send an enquiry
Send an enquiry