How to choose commercial battery storage installers: a 2026 checklist

Nine checks to make before you hire commercial battery storage installers, with where to verify each one. This guide comes from an independent information site that does not install batteries.

A commercial battery installer does more than fit equipment. They size the system, design the fire safety, take the grid application through your network operator and, often, maintain the system for a decade or more. The checks below separate installers who can do all of that from those who mainly sell hardware. Most can be verified against a register or a document rather than taken on trust.

The checklist at a glance

  1. The design follows the current standards
  2. A track record of G99 connections
  3. Safety evidence for the exact product
  4. Manufacturer approval and warranty terms
  5. Assessed electrical competence
  6. MCS, only where it applies
  7. Insurance, in date and in the company's name
  8. Who takes the CDM 2015 duties
  9. The company behind the quote

1. The design follows the current standards

Ask: Ask for confirmation, in writing, that the installation is designed to BS 7671 as amended by A4:2026 (including the new Chapter 57 for battery installations) and to the IET Code of Practice for Electrical Energy Storage Systems.

Why it matters: Amendment 4 was published on 15 April 2026 and the previous edition of BS 7671 was withdrawn on 15 October 2026. An installer who cannot name the documents their design follows is not ready to design your system.

The fire safety standards map

2. A track record of G99 connections

Ask: Ask which G99 applications they have taken through your network operator in the last two years, how long each took, and who will submit yours and when.

Why it matters: For most commercial batteries the connection, not the hardware, sets the programme. An installer who plans to apply after design sign-off is adding months.

How the G99 timeline works

3. Safety evidence for the exact product

Ask: Ask for conformity evidence for BS EN IEC 62933-5-2 (the system) and IEC 62619 (the cells and battery modules) for the model being quoted, not the manufacturer's range in general.

Why it matters: Your insurer and, on larger sites, the fire and rescue service will ask the same question. It is easier to get the answer before the order.

What each standard covers

4. Manufacturer approval and warranty terms

Ask: Ask the manufacturer, not only the installer, whether the installer is approved for the product, and whether the warranty depends on that. Then read the warranty itself: its length, any energy-throughput or cycle limit, the capacity it guarantees at the end, and who honours it if the installer stops trading.

Why it matters: Battery warranties differ more than the headline "10 years" suggests, and some depend on who installed the system.

5. Assessed electrical competence

Ask: Check whether the firm is registered with an electrical certification scheme; registrations with the main schemes can be searched on the Electrical Competent Person register. Ask as well for two or three comparable commercial or industrial installations you can discuss with the client.

Why it matters: That register is aimed at householders and landlords: it shows the firm's electrical work is assessed, but not that it has delivered commercial battery projects. References close the gap.

Electrical Competent Person register

6. MCS, only where it applies

Ask: For a small system, check the MCS certificate covers battery storage. For most commercial systems, do not treat MCS as the test.

Why it matters: MCS's battery installation standard (MIS 3012) covers installations up to 50 kW. Most commercial batteries are larger, so the checks above matter more.

MCS battery installation standard

7. Insurance, in date and in the company's name

Ask: Ask for certificates for employers' liability, public liability and, if they design the system, professional indemnity. Check the named company matches the one on the quote.

Why it matters: Employers' liability insurance is a legal requirement for employers and must cover at least £5 million, from an authorised insurer. The other two are not compulsory, but a commercial installer without them is carrying risk that could land with you.

gov.uk: employers' liability insurance

8. Who takes the CDM 2015 duties

Ask: Ask who will act as principal designer and principal contractor, and what they need from you as client.

Why it matters: Under CDM 2015, client duties apply in full to a business carrying out a construction project. Where more than one contractor is involved, which is common once civils, cranage and grid works are counted, the client appoints a principal contractor to control the construction phase.

HSE: commercial clients under CDM 2015

9. The company behind the quote

Ask: Search the company on Companies House: its status, how long it has traded, whether its accounts are filed on time, and who the directors are.

Why it matters: A battery warranty and maintenance contract can run for a decade or more. It matters whether the company is likely to be there to honour it.

Companies House search

Red flags

  • A price before any data. A firm quote without your half-hourly meter data is a guess about size, and size drives most of the cost.
  • No mention of the grid connection. A proposal that does not say who submits the G99 application, and when, has left out the longest part of the programme.
  • No answer on planning. For an outdoor container, ask who prepares the planning application and who talks to the fire service; see battery storage planning permission.
  • PAS 63100 as the commercial fire standard. It covers dwellings; see PAS 63100 explained.
  • Guaranteed savings figures. Savings depend on your tariff, load profile and how the battery is operated. A credible proposal shows its assumptions instead of promising a number.
  • Pressure to sign quickly. An expiring discount is not a reason to skip the checks on this page.
  • Accreditations you cannot find. If a logo on a website does not match an entry on the issuing body's register, ask why.

How to compare quotes

Ask every installer to itemise their proposal the same way. A like-for-like comparison needs, at least:

LineWhat to check
Battery and power conversionUsable capacity (kWh) and power (kW), chemistry, the inverter or power conversion system, and the product standards evidence
Controls and meteringThe energy management system, what it optimises for, and any monitoring subscription after year one
Civils and installationBase or plinth, cranage, cabling routes, and any indoor room works such as compartmentation and ventilation
Grid connectionThe G99 application, network operator fees, and whether any reinforcement cost is included or excluded
Fire and safetyDetection, any suppression, separation or venting, and the design documents your insurer will need
Commissioning and handoverTesting, certification, operating manuals and training for your site team: what a full commissioning handover includes
Warranty and maintenanceWarranty terms (years, throughput, end-of-warranty capacity) and the cost and scope of the maintenance contract

Just as important is what each quote excludes. Two proposals at the same price can differ by the cost of the grid works. For typical price ranges, see the cost guide; for the tax position, see capital allowances.

How this site handles quote requests

This site is published by SEO Dons Ltd. It is an information site, not an installer, and it holds no installer accreditations. If you send an enquiry through a form here, the publisher replies by email; enquiries are not passed to installers (see the privacy notice). Nothing here is a recommendation of any installer: apply every check on this page to any installer, however you found them.

Send an enquiry, then check any proposal against this list

No obligation. This site is not an installer.

  • 1. Tell us about the site: what you want the battery to do, your supply, and any half-hourly data you have.
  • 2. We reply by email. This site is not an installer and takes no part in the work. There is no fixed reply time.
  • 3. Check any proposal you receive against the installer checklist before you commit to a survey.

By sending this you agree to the privacy notice, which explains that your enquiry is answered by the publisher by email and is not passed to installers or sold to anyone.

Choosing an installer: questions

What should I look for in a commercial battery installer?

Evidence that the design follows BS 7671 as amended by A4:2026 and the IET Code of Practice for Electrical Energy Storage Systems, a record of G99 connections with your network operator, safety evidence for the exact product, manufacturer approval where the warranty depends on it, insurance certificates in the company's name, a clear answer on CDM 2015 duties, and a company history you can check on Companies House.

Does a commercial battery installer need to be MCS certified?

Not usually. MCS's battery installation standard (MIS 3012) covers installations up to 50 kW, and most commercial systems are larger. For those, check design standards, grid-connection experience and references from comparable commercial projects instead.

How many quotes should I get for commercial battery storage?

Two or three is usually enough, provided each is based on your half-hourly meter data and is itemised the same way. Quotes built on a rule of thumb rather than your data are hard to compare and often wrong on size.

Who is responsible for health and safety on a battery installation?

Everyone has duties under CDM 2015, including you as a commercial client. Where more than one contractor is involved, the client appoints a principal designer and a principal contractor; the principal contractor controls the construction phase. Agree who takes each role before work starts.

Does this site vet or recommend installers?

Do not take any introduction as a recommendation. This site does not introduce, recommend or vet installers; it does not install batteries, certify installers or supervise the work. Apply every check on this page before you commit to a survey or a contract.

Sources

Checked 29 September 2026.

How this site works

  • Independent information site
  • Not an installer: no accreditations claimed
  • Enquiries answered by the publisher by email
  • Free to use, no obligation
  • No phone number needed
Send an enquiry
Send an enquiry