Industrial battery storage installation: what changes on an industrial site

An independent UK guide to installing a battery on a factory, process plant or other heavy-load site. This site is not an installer.

Have a site in mind? Send three details and get a reply by email. This site is not an installer.

Ask about an industrial battery installation

Three details and a reply by email. This site is not an installer.

By sending this you agree to the privacy notice: your enquiry is answered by the publisher by email and is not passed to installers or sold to anyone.

What is different about an industrial site

The stages are the ones in the commercial battery storage installation guide. Four things move on an industrial site:

  • The connection. Industrial sites often have an HV supply or a large LV site-specific supply, so the battery may connect through a transformer and HV switchgear rather than a simple LV board. The network operator sets the voltage and any works in its connection offer.
  • The load. A process load has its own peaks, ramp rates and shift pattern. The battery is sized from twelve months of half-hourly data for the peaks it must shave, not from a rule of thumb, and the controls must not fight the plant.
  • The tie-in. The battery is joined to live switchgear. That needs a planned outage agreed with production, a method statement, and a plan for what runs on temporary supply.
  • The site risk. The battery joins an existing fire risk assessment, insurer arrangements and, on a multi-contractor site, CDM 2015 duties. See battery storage fire safety.

Grid connection by size: G99 types and the 5 MW threshold

G99 groups a battery that can export by registered capacity. According to the ENA Distributed Generation Connection Guide (March 2025), Type A is below 1 MW, Type B is 1 MW to under 10 MW, Type C is 10 MW to under 50 MW and Type D is 50 MW or more (or any connection at 110 kV and above), for connections below 110 kV. Most industrial behind-the-meter batteries are Type A or Type B. The same guide gives network-operator quotation clocks of 45 working days for LV and 65 for HV connections.

Larger projects may also need a Transmission Impact Assessment. In England and Wales the threshold was raised from 1 MW to 5 MW (change CMP446, May 2025) where there are no fault-level issues, according to NESO. The full process is in the G99 application guide, and who your DNO is depends on your MPAN.

Red-band charges differ by network operator

For an industrial battery, the value of discharging in the red band depends on when the red band is and what it costs, and both are set per distribution licence area. The table gives the Monday to Friday red window and the range of non-domestic red unit rates in each operator's 2026/27 schedule of charges (effective 1 April 2026). It is a distribution charge only, one component of a supplier bill, and the range covers all non-domestic tariffs and bands, so find your own tariff in the schedule.

Licence areaRed band, Mon-FriNon-domestic red range, p/kWh
Northern Powergrid (Northeast)16:00-19:303.403 to 12.823
Northern Powergrid (Yorkshire)16:00-19:302.514 to 8.165
Electricity North West16:00-19:000.000 to 15.538 (varies by band)
NGED (East Midlands)16:00-19:002.837 to 12.031
NGED (West Midlands)16:00-19:001.764 to 10.325
NGED (South West)17:00-19:007.242 to 24.204
UKPN (Eastern)16:00-19:004.837 to 11.716
UKPN (London)11:00-14:00 and 16:00-19:000.009 to 9.881 (varies by band)
UKPN (South Eastern)16:00-19:006.010 to 15.864
SSEN (Southern)16:30-19:300.000 to 12.061 (varies by band)

Not listed: NGED (South Wales), SP Manweb and the two Scottish licence areas; read their own 2026/27 schedules. Times are UK clock time.

Tie-in, outages and commissioning

Ask for the tie-in to be planned into a single agreed outage, with the isolation points, temporary supplies and restart sequence written down before anything is ordered. Commissioning follows the G99 type, with the network operator able to witness the tests; see battery storage commissioning for the forms and the handover pack. On an industrial site also ask for the protection settings to be agreed with whoever maintains the site's HV network.

Siting, fire and planning

Most industrial batteries are containerised and outdoors, on a prepared hardstanding with separation from buildings and a route for the fire service; a few go in a switchroom. The design follows the IET Code of Practice for Electrical Energy Storage Systems and the references on the fire safety page, and the insurer should see the design before it is frozen. An outdoor container usually needs planning permission: see planning permission for battery storage, and containerised BESS installation for the delivery sequence.

Cost and tax

Published UK ranges put containerised systems of 500 kWh and above at about £140 to £240 per kWh, before grid works; the cost guide gives the sources. A company can claim the Annual Investment Allowance on up to £1m of qualifying spend a year, and the treatment above that depends on how the battery is classified (capital allowances). Take your accountant's advice before modelling it.

What to ask an installer for an industrial site

  • Which G99 Type B (or HV) applications they have taken through your network operator, and how long each took.
  • Who designs the HV tie-in and the protection, and who owns and maintains the transformer and switchgear afterwards.
  • The outage plan: how long, when, and what happens if it overruns.
  • How the controls were tested against a live process load, and what the battery does when the site trips.
  • Who holds the CDM 2015 principal-contractor duties on your site (HSE guidance for commercial clients).
  • The contents of the commissioning pack and the O&M regime, in writing. The installer checklist has the full set.

Send an enquiry about an industrial battery installation

No obligation. This site is not an installer.

  • 1. Tell us about the site: what you want the battery to do, your supply, and any half-hourly data you have.
  • 2. We reply by email. This site is not an installer and takes no part in the work. There is no fixed reply time.
  • 3. Check any proposal you receive against the installer checklist before you commit to a survey.

By sending this you agree to the privacy notice, which explains that your enquiry is answered by the publisher by email and is not passed to installers or sold to anyone.

Industrial battery installation questions

What is industrial battery storage installation?

It is the installation of a commercial battery energy storage system (BESS) on an industrial site, typically a factory, process plant, cold store or large distribution site with heavy electrical load. The route is the same as any commercial battery: survey, G99 connection application, fire and siting design, installation and witnessed commissioning. What changes is the connection voltage, the process load the battery must tie into, and the outage window available for the tie-in.

Does an industrial battery need a high-voltage connection?

Not always, but larger systems often connect at high voltage through a transformer and HV switchgear, particularly where the site already has an HV supply. The network operator confirms the connection voltage in its offer. The G99 type follows the registered capacity: Type A is below 1 MW, Type B is 1 MW to under 10 MW, and Type C is 10 MW to under 50 MW, for connections below 110 kV.

How long does an industrial battery installation take?

The physical work is usually weeks, but the programme is set by the network operator. The ENA guide gives quotation clocks of 45 working days for LV and 65 for HV connections, and the offer, any reinforcement and the commissioning window come after that. An industrial tie-in also has to fit a planned outage on the production schedule.

Do the red-band charges differ by region?

Yes. Each distribution network operator publishes its own time bands and unit rates. For 2026/27, NGED South West has the shortest Monday to Friday red band (17:00 to 19:00) and the highest non-domestic red range in the table above (up to 24.204 p/kWh), while UKPN London has two red windows. These are distribution charges only; your supplier bill adds other costs. Check the schedule for your own licence area and tariff.

Is planning permission needed for an industrial battery?

Usually yes for an outdoor container or compound, because the permitted development rights for renewable energy in England do not include batteries; an indoor cabinet in an existing building may not. The local planning authority decides, and fire and rescue service consultation is common. See the planning permission guide for the route by nation.

Sources

Checked 10 November 2026. Charges are revised each April; your connection offer and tariff are the documents that apply to your site.

How this site works

  • Independent information site
  • Not an installer: no accreditations claimed
  • Enquiries answered by the publisher by email
  • Free to use, no obligation
  • No phone number needed
Send an enquiry
Send an enquiry